Java Mailing List Archive

http://www.junlu.com/

Home » Home (12/2007) » JDOM User »

[jdom-interest] Ship date

Phill Perryman

2004-09-09

Replies:


Any idea how long before 1.0 goes out.

I have updated my local code to 1.0 format and all testing is complete and OK. I can either send the 1.0 compatible code to my cvs server or load the 0.9 compatible code from it.

I am due to release a new version of my code to my userbase soon.

Do I drop all my 1.0 changes and ship a version 0.9 and re-do the changes or hang on and ship a 1.0 version with the new jar.

I have to get off the fence on this one in the next week or two.

/Phill
IS Dept, Software Engineer.
phill_perryman@mitel.com
http://www.mitel.com
Tel: +44 1291 436023
_______________________________________________
To control your jdom-interest membership:
http://www.jdom.org/mailman/options/jdom-interest/youraddr@(protected)
©2008 junlu.com - Jax Systems, LLC, U.S.A.